july 30 update-
the body went to matt today for finishing sanding and high build primer.
the 3\" lift has been cut in half lengthways, a pie shape taken out, and rewelded to achieve a 2\" rake ( 1\" at the front, 3\" rear )
the front beam is assembled and painted with clovacoat 3000, bulletproof paint/ hardner combo
the pan is finished being welded and is gettin ground down, and made all pretty like, then a coat of paint or powder???
soon come
vic